Dhaka, Bangladesh 01-08-2018
The problem of lid-driven flows in cavities has been major topic for research studies due to its fundamental nature and owing to the wide spectrum of engineering applications such as electronic device cooling, crystal growth, high-performance building insulations, multi shield structures used for nuclear reactors, food processing, float glass production, solar power collectors, furnace, drying technologies, etc. In this article Numerical study of the effect of Prandtl number on nanofluid flow inside a porous cavity in a two-sided lid driven square closure is studied. The working fluid is Cu/water nanofluid. By Finite Element Method the governing partial differential equations are solved. The highest Pr causes the greatest heat and mass transfer. The enhancing performance of heat and mass transfer rate is more effective for the water-Cu nanofluid than the base fluid. It is assumed that the temperature difference driving the mixed convection comes from the side moving walls, when both horizontal walls are kept insulated. In this research, the effect of Prandtl number from 0.71 to 10 on nanofluid flow is investigated. The values of Richardson number, solid volume fraction of water/Cu nanofluid, Darcy number are kept fixed as 10, 2% and 0.01 respectively. The phenomenon is analysed through streamlines, isothermal lines, iso-concentration lines plots, with special attention to the Nusselt number and Sherwood number. It is found that heat- mass transfer becomes higher by using water/Cu nanofluid than clear water.
Keywords- Mixed convection; porous cavity; nanofluid; finite element method; Prandtl number.
This study is focused on apply lean tools for improving manufacturing process with standardization of process cycle time and waste reduction. Self-customized questionnaires, time study forms and 5S checklists are used in information gathering and computation. Unnecessary transportation and movement were observed as non-value added activities and defects also found due to poor 5S practice. Lack of standard operation time or any other lean tools are found. After implementation of lean tools like cycle time analysis and operation bulletin, the standard time for every process was determined and the non-value added activities were also reduced thus, the productivity improved. The lean implementation results in efficiency increase and reduce rejection rate. Applying lean tools brought remarkable changes in process flow and productive and efficient operations, which allows focusing on the customers demand, delivering quality products at the right time.
Keyword- Lean Manufacturing, 5S, Productivity, Time Study